Active job

Final As Built Engineering Drawings for manhole cover move

Job description

Land Surveyor
Auckland

Published: 10 May 2018

We have a final As Built that is required by the City Council in their Development Engineering As-built requirements (section 2.5). We moved a manhole on our property and our engineer retired just before the final drawing (the as built). We have his original drawings (as CAD files) and the levels from the Registered Surveyor but need someone who is able to put them all together as per council requirements.


Trade professionals

#1 Tradie 1
44 jobs No longer in contact
#2 Tradie 2
5 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo