Published: 23 June 2023
All guttering on house to be replaced. That is both levels of house. Level close to the road is bedrooms &toilet/bathroom. Upper level is kitchen,dining and lounge. Scaffolding will be required. Would like it done as soon as possible.
Workmanship |
3.0
|
Cost |
2.0
|
Schedule |
1.0
|
Communications |
2.0
|
Not completed on schedule. Still not completed after many texts, phone calls and several visits. Supposed to be completed today. No show.
Work carried out by the owner/operator
Reviewed on 14-11-2023
Partner with Builderscrack
Get work