Published: 9 July 2024
Missing downpipe brackets need to be replaced, and existing brackets need to be checked to ensure they are securing downpipe. There are 2 downpipes to be checked & repaired, one at the front and one at the back of the building. The height of the building is 11 metres, so access equipment will be required to ensure the job is completed safely.
Partner with Builderscrack
Get work