Published: 20 February 2024
The bathroom is apprx 3x2 metres with a older step over and in shower, sink and bath. We wish to remodel by removing the shower, bath and vanity and installing a new shower with a door (not curtain ) that has nothing to step over. Fit a new wall hung vanity with draws ( not cupboards ). Placement of the shower can be different if possible. New floor coverings, better extraction etc. Best to view to ascertain the best approach.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Can’t speak highly enough of this company. Stressful situation adopting a bathroom to my parents needs under time constraints and all went perfectly. The communication was timely, accurate and helpful. All time frames were met. Jesse added value throughout and went out of his way to help my folks uplift materials and supplies and respected their home completely throughout the renovation. Finished product was better than hoped. Can’t speak more highly for Jesse and his overall capabilities.
Work carried out by the owner & subcontractors
Reviewed on 19-05-2024
Partner with Builderscrack
Get work