Published on 26 July 2018
My bathroom is currently about 2mx2m with only bath, toilet, vanity and no shower. I need full replacement for all fixtures, plumbing, electrical and tiling of floors and walls/part walls. Building work includes removal of a wall to extend room to add a tiled alcove shower (approx 0.9m x 1.5m. Also moving current bathroom door, closing in old door to bedroom and creating new door to bedroom beside bathroom with associated wall framing. In addition I want to create a new ensuite in downstairs room - approx 1.2mx2.4m wtih shower, vanity, toilet with sanismart. I have plans for both bathrooms available. Looking to have main bathroom renovation done in late Sept-October. Would like interested tradies to contact me asap, before 30 July.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Highly recommended. We were extremely satisfied with Paul's service, quality of work, attention to detail and expert project management of all the sub-contractors.
Work carried out by the owner/operator
Reviewed on 11 November 2019
Partner with Builderscrack
Get work