Published: 10 October 2020
Removal of Spa bath and existing shower. Replace toilet. Add new walk in shower, relocate vanity. Replace existing tiles with new, some electrical work needed
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Love our new bathroom, Andre did a great job. Complete reno, original bathroom was completely gutted. Spa bath gone, now in it's place is a tiled walk-in shower with a frosted glass shower screen, replaced the toilet, cubicle shower removed and now a nice wall hung vanity in it's place, along with a new tile floor and heated towel rail
Work carried out by the owner/operator
Reviewed on 16-04-2021
Partner with Builderscrack
Get work