Published: 13 March 2019
Glass shower needs to be installed ( --- ), bath needs to be ripped out, vanity replaced in same position as old one, toilet replaced. Also same position. Lino ripped up and replaced. Windows and doors repainted white. Handles replaced. Shower, toilet and vanity with all taps, ordered and must get them delivered soon as Mitre 10 won't store for much longer. Waiting on a quote from a builder but he won't be free for at least a month.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I was very pleased with the final result and would recommend PeterBuildit to anyone wanting this kind of work done. Peter is a very pleasant man to deal with and all the Tradesmen he used were extremely efficient.
Work carried out by the owner & subcontractors
Reviewed on 27-05-2019
Partner with Builderscrack
Get work