Posted 4 years ago
Bathrooms & Flooring
Bathroom Renovation
Takanini, Papakura
Need to get following works done:
1. Take out existing toilet seat, shower cabin, vanity & tiles from both bathrooms & toilet.
2. Take out tub in bathroom 2.
2. Take out existing tiles from Kitchen, entrance, laundry & side strips in living rooms.
3. Put new tiles in all the areas where tiles were uprooted.
4. Install Shower cabins with full tiles & tiled base with waterproofing
5. Install 3 new Toilets (WC)
6. Install new vanity in both bathrooms
7. Restore all plumbing connections....