Need to get following works done: 1. Take out existing toilet seat, shower cabin, vanity & tiles from both bathrooms & toilet. 2. Take out tub in bathroom 2. 2. Take out existing tiles from Kitchen, entrance, laundry & side strips in living rooms. 3. Put new tiles in all the areas where tiles were uprooted. 4. Install Shower cabins with full tiles & tiled base with waterproofing 5. Install 3 new Toilets (WC) 6. Install new vanity in both bathrooms 7. Restore all plumbing connections. Approximate areas: Bathrooms: 7.5 sqm each Toilet: 3 sqm Laundry: 6 sqm Kitchen & side strips: 15 sqm Entrance: 6 sqm Tiles & Bathroom ware will be provided.
#1 | Tradie 1 |
|
101 jobs | No longer in contact |
#2 | Tradie 2 |
|
8 jobs | No longer in contact |
#3 | Tradie 3 |
|
169 jobs | No longer in contact |
#4 | Tradie 4 |
|
16 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
#6 | Tradie 6 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work