Active job

bathroom makeover

Job image
Job image
Job image

Job description

Bathroom Renovation
Papakura

Published: 22 November 2016

Ensuite bathroom is roughly 2.5 by 2.5 metres, require stripping out the old shower and vanity, replacing floor, replacing existing gib with aqualine; waterproofing, and installing new shower and vanity once tiled; I have a plumber who will decommission and re-plumb for new shower and vanity & tiler


Trade professionals

#1 Tradie 1 No recent reviews 65 jobs No longer in contact
#2 Tradie 2 No recent reviews 8 jobs No longer in contact
#3 Tradie 3 No recent reviews 3 jobs No longer in contact
#4 Tradie 4
48 jobs No longer in contact
#5 Tradie 5 No recent reviews 0 jobs No longer in contact
#6 Tradie 6
64 jobs No longer in contact
#7 Tradie 7 No recent reviews 6 jobs No longer in contact
#8 Tradie 8 No recent reviews 4 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo