Active job

New Bathroom / Renovation

Job description

Bathroom Renovation
Papakura

Published: 12 September 2016

Bathroom is Approx 5m x 3m and separated in to 2 entrance doors and a dividing door in the middle My plan is to make the bathroom one complete room. This will involve filling in 2 door and there is 1 internal window pane and 1 external window that will also need blocking I will plan to do most of the demolition work myself. I will need to have the shower installed and the tiling for the bathroom completed


Trade professionals

#1 Tradie 1 No recent reviews 85 jobs No longer in contact
#2 Tradie 2
10 jobs No longer in contact
#3 Tradie 3 No recent reviews 1 job No longer in contact
#4 Tradie 4 No recent reviews 6 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo