Posted 10 years ago
Bathroom Renovation
Bathroom Renovation
Awapuni, Palmerston North
To supply and install new acrylic shower in same location, new vanity in same location and extra toilet in the bathroom next to basin .
PLUMBING; Poly piping connected to existing hot and cold water supply.
Toilet to connect into existing toilet pipe. New waste pipes to run to existing gully trap.
Close coupled toilet, 9x9 frameless mirror, 500mm basin, 9 x 9 curved acylic shower, taps, shower mixer and slide shower.
Strip existing wall linings and fix new aqualine Gib board along w...