Published: 1 September 2020
We would like a quote for work to renovate this early-2000s bathroom. Plan is to replace vanity and shower, leave bath, preferably leave flooring. Plumbing stays in same place. Job would involve: - Replace old shower ( --- ) with acrylic shower --- , with plumbing in same position. We have been told this shower leaks ?extent, possible repairs needed once removed, shower area may need to be relined also - New vanity to be installed in same position - Replace heated towel rail - Investigate options to replace bath mixer on bath - presumably remove tiles/GIB behind bath to access and then replace GIB (we will have a tiler we know replace the tiles) At this stage we're looking to source the fittings ourselves. Please do not quote for paint (we will DIY) or tiling.
#1 | Tradie 1 | No recent reviews | 22 jobs | No longer in contact |
#2 | Tradie 2 |
|
148 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 42 jobs | No longer in contact |
#4 | Tradie 4 |
|
60 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 31 jobs | No longer in contact |
#6 | Tradie 6 |
|
262 jobs | No longer in contact |
#7 | Tradie 7 |
|
121 jobs | No longer in contact |
#8 | Tradie 8 |
|
51 jobs | No longer in contact |
Partner with Builderscrack
Get work