Active job

Sleepout plumb.

Job description

New Home Plumbing
Waitakere

Published: 17 June 2024

Hi. Seeking interest/quote for the plumbing of a sleepout being built. Easily accessible site from drive - about 10 steps with completely flat section. The following is what is required, with the line and connection to the main sewerage line already having - sewer line from under slab connection to pump station - sippy and install overflow gully next to bathroom. - supply and install vent - dig hole for pump station - supply and install deep fast flow pump station - install pump and conduit to slab - connection of 2 new dps from sleep out to existing sw line - supply and install cesspit near corner of sleep out to take ground water and nova flow from retaining wall. - waste and water pipe out for 1 toilet - waste and water pipe out for 1 vanity - waste and water pipe out for shower - supply and install 135L Rheem hwc - fit off of white wear and tap wear provided by owners


Trade professionals

#1 Tradie 1
64 jobs Requesting contact
#2 Tradie 2
14 jobs Requesting contact
#3 Tradie 3 Not reviewed 1 job Requesting contact
#4 Tradie 4 Not reviewed 0 jobs Requesting contact
#5 Tradie 5
3 jobs In contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo