Published: 19 May 2020
After a quote for both options, replacement of the existing low pressure to mains pressure cylinder (180L replacement if possible) vs a Rheem 27 or similar units. See pics. Unit is leaking, possibly Ajax valve ? Electrical work can be carried out by the owner, please leave this out of the quote.
#1 | Tradie 1 |
|
559 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 4 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 77 jobs | No longer in contact |
#4 | Tradie 4 |
|
56 jobs | No longer in contact |
#5 | Tradie 5 |
|
50 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 26 jobs | No longer in contact |
Partner with Builderscrack
Get work