Published on 19 March 2018
1) improve drainage on side of house around 12m and connect to existing waste water drain. 2) Install a gravel pad approximately 20 square meters by approx. 250mm to 300mm deep to support transportable sleep out. 3)Install waste and waste water pipes and link to current drains. Also run empty electrical conduit to allow electrical connection from sleep out to existing house.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Thanks Brett for a Job well Done. Excellent job and will use again.
Work carried out by the owner/operator
Reviewed on 10 April 2018
#1 | Tradie 1 | No recent reviews | 34 jobs | Secured job |
#2 | Tradie 2 |
|
54 jobs | No longer in contact |
#3 | Tradie 3 |
|
138 jobs | No longer in contact |
#4 | Tradie 4 |
|
29 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 24 jobs | No longer in contact |
Partner with Builderscrack
Get work