Published: 11 October 2016
We need a drain-layer ASAP (until 14.10.) to finish off a job that has been left earlier in the build. Need to connect downstairs bathroom and toilet to waste water. Temp. drains existing for upstairs. Length approx. 8m. Trench mostly pre dug. See photos. (We have a pump to drain the water.)
Workmanship |
4.0
|
Cost |
3.0
|
Schedule |
4.0
|
Communications |
3.0
|
Lukas did a good job and tried to fit me into his busy schedule as it turned out to be more work (actually multiple jobs) than initially anticipated.
Work carried out by the owner & subcontractors
Reviewed on 18-11-2016
Partner with Builderscrack
Get work