Published: 19 May 2024
Reposting without the tiling component: Old laundry tub and tapware to be removed and second hand super tub to be installed. brown tiles above to come out, re-gib. I think it is particle board currently, so suspect will have to gib the whole wall under window and the wall next to. But open to recommended approach. Plastering NOT required. Tiling NOT required.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great team, installed a new laundry tub sink for us. They got in and completed the job quickly and went the extra mile to do things we hadn’t thought of that would get a better finish.
Work carried out by the owner/operator
Reviewed on 08-07-2024
Partner with Builderscrack
Get work