Published: 29 February 2008
Kitchen Renovations Hi - sorry my requirements have changed slightly, though I will still need the same trades people. So - more accurate measurements of my kitchen are 2.9M x 4.9M I will pull out the old kitchen - here is what I need done (in order) 1 - Prep and paint ceiling, walls and window framing 2 - Lift old flooring 3 - Lay new flooring 5 - Install new kitchen cabinetary (will already be assembled) 6 - Install benchtops (cut new sink bowl) 7 - Fit tapware 8 - Install new rangehood 9 - Install new lights & powerpoints I have plans of the kitchen if you want to have a look, alternatively please contact me to arrange a time to have a look and quote on the job. Thank you!
Workmanship |
5.0
|
Highly recommended, John came around and quoted on the job. Ben? I think his name was completed the work to a high standard. Thank you.
Reviewed on 16-10-2008
#1 | Tradie 1 | No recent reviews | 75 jobs | Secured job |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 14 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 6 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work