We have a new extension with 2 down pipes that need connecting to existing system. One pipe runs from one side of the extension through existing base (holes in concrete base already exist) to the other side; approximately 7m. This then connects with the down pipe on other side, runs around the base about 4m to the existing down pipe. Job required within 1 month to get building consent signed off.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great to work with your team on this small project.
Work carried out by an employee of the company
Reviewed on 15-06-2022