Review

Connecting down pipes

Job description

Drainlaying
Franklin

We have a new extension with 2 down pipes that need connecting to existing system. One pipe runs from one side of the extension through existing base (holes in concrete base already exist) to the other side; approximately 7m. This then connects with the down pipe on other side, runs around the base about 4m to the existing down pipe. Job required within 1 month to get building consent signed off.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo