Published: 1 May 2015
Plaster 3 bedrooms and a lounge Will include celings and walls Lounge and one bedroom is new gib on celing all other surfaces to grade 4 finish following wall paper removal. Lounge floor area is 24m2 1 bedroom 10m2 1 bedroom 12m2 1 bedroom 16m2 Quote required. Work start in 3 weeks.
Workmanship |
3.0
|
Cost |
5.0
|
Schedule |
1.0
|
Communications |
4.0
|
He turned up on time on the first day and then after that he was constantly late. He said the job would take a week, in the end it took 2. His work that he did was great however he missed quite a lot that had to be pointed out and there are parts that were not finished. He was however excellent to communicate with.
Work carried out by the owner/operator
Reviewed on 13-06-2015
Tradesperson reply
"Jeez Bob thanks for the nice mixed review. I thought in giving me the garage remote I was able to come and go as I pleased. Also you said it didnt matter if it ran into the next week so why raise this?
Thanks however I enjoyed the work."