We are seeking someone to plaster both sides of a newly constructed wall ready for painting. The wall separates two existing bedrooms and has a step in it making one room larger than the other. Timing: Any time between 14 February - 12 March. Detail: - The total surface area of the new wall (both sides) is approximately 26 square meters. - The wall is standard height at 2400mm except for the final section where the roof is sloped - Dimensions: first section of the wall is --- , the step section is --- , and the final section is --- - The wall has 7 vertical gib board joins, 2 outward facing corners and 2 inward facing corners. - We will be installing architraves at the join between the gib board and the ceiling so this join does not need to be plastered


Review

Workmanship
4.0
Cost
5.0
Schedule
5.0
Communications
5.0

Steve did a wonderful job of plastering a new wall between two bedrooms in our house. Great communication, the work was done on time and at quoted cost. Thanks so much!

Work carried out by the owner/operator
Reviewed on 28-03-2022

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo