Published: 9 October 2016
Hi, we are re-lining 1.5 walls of our bathroom and need them gib stopped. It is not a large area, one wall is approximately 2m x 2.4m and the other area is 1m x 24.m. The gib is already in place. We need this job done as soon as possible. Early next week is ideal.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Second time working with Mr Gib and would definitely use again!
Work carried out by the owner/operator
Reviewed on 25-10-2016
Partner with Builderscrack
Get work