Published: 17 June 2024
Bathroom GIB stopping required. The bathroom will have been fully gutted and new Aqualine Gib installed. The requirement is to Gib stop/ plaster the ceiling (5m) and walls (21m) to a level suitable for painting. Needs to be done in approx 10-15 days time. Location is in West Harbour. A good job may lead to more work as a lounge area needs wallpaper stripped and plastered.
#1 | Tradie 1 |
|
24 jobs | In contact |
#2 | Tradie 2 |
|
9 jobs | No longer in contact |
#3 | Tradie 3 |
|
21 jobs | No longer in contact |
#4 | Tradie 4 |
|
64 jobs | No longer in contact |
#5 | Tradie 5 |
|
17 jobs | No longer in contact |
#6 | Tradie 6 |
|
2 jobs | No longer in contact |
#7 | Tradie 7 |
|
3 jobs | No longer in contact |
#8 | Tradie 8 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work