Published: 16 January 2011
have some 8 sheets braceline, 10 sheets standard and 3 sheets aqualine to be stopped. required between 19th and 21st if possible.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very prompt and good communication.
Work carried out by the owner/operator
Reviewed on 16-08-2011
Partner with Builderscrack
Get work