Published: 10 May 2024
New wall linings. Some internal walls have been pulled out and beams that will need plastering around. Some walls in a bedroom stripped for Bracing. Walls only. No gib cove No skirting or architraves fitted. Post line inspection is booked for Friday the 17th of May. So start after this date
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Mosese is great at communicating, he turned up when he said he would, tidied up after he finished and has great workmanship.
Work carried out by the owner/operator
Reviewed on 01-06-2024