Published: 9 July 2024
Need some plastering in bathroom, around some new Gib that was installed while replacing a shower. The corner and wall to roof joints are 2.4m. The join between the 2 new pieces of Gib (horizontal) is about 1.5m
Partner with Builderscrack
Get work