Published: 9 February 2022
New joinery has been fitted and some gib board was replaced after relocating plumbing and power. The ensuing "patch" now needs to be plastered to wallpaper standard to match the rest of the wall. There is an area above the bench at 1100 x 500mm and a corresponding area below the bench at 900 x 500mm (approx). The patch is set into the existing wall approx 3mm and needs to be built out for an even finish.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Thanks Danny for a great job and at such short notice. Very impressive communication and punctuality and always with a smile. Great stuff!
Work carried out by the owner/operator
Reviewed on 16-02-2022
Tradesperson reply
"Thanks for your payment and feedback. We appreciate it. We are looking forward to work with you again.
Many thanks
Danny"
Partner with Builderscrack
Get work