Published: 9 November 2011
We require a plasterer to plaster a newly gibbed sleepout which is 3m2 with a pitched ceiling. We would like a quote, and to have the job done by the 18th of November.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Great worker, good communication and he tidied up after himself so we were very happy. thanks.
Work carried out by the owner/operator
Reviewed on 20-11-2011
Partner with Builderscrack
Get work