Posted 4 years ago
Reinstatement works
Asphalt
Mount Wellington, Auckland
Area 1 - Road: Mill existing asphalt 40mm thick, apply bitumen emulsion tackcoat, supply and lay 40mm thick AC10 hotmix asphalt. Joint seal edges of patch. Approximately 6m2.
Area 2 - Footpath: Remove existing materials and reinstate footpath with matching concrete [20MPA 10mm exposed with black oxide 4Kgm3]. Approximately 1m2
Area 3 – Boundary area between Footpath and Road: Remove existing materials and relay boundary area with new black asphalt. Approximately 3m2