Ground preparation and laying of asphalt path between 2 houses, running from street footpath to wooden step. Total area = 14.5m2 . Total length 12.2m. Width 1.2m average. There is a plastic sewerage pipe running part of the length. Presently there are loose bricks which we will remove if required by contractor. Machinery can be parked on street directly outside Work to be done as soon as possible please.
#1 | Tradie 1 | No recent reviews | 174 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 21 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 2 jobs | No longer in contact |
#4 | Tradie 4 |
|
16 jobs | No longer in contact |
#5 | Tradie 5 |
|
270 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 4 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 0 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 46 jobs | No longer in contact |
Partner with Builderscrack
Get work