Published: 10 March 2011
We have a 3 bedroom house that has a number of rooms where wallpaper has been partualy stripped or is still fully on but has been painted over. We are wanting to have the wall paper stripped and the surface prepared for painting. Looking to have the hallways and lounge done by first week April. There is a resonable amount of hall way cuboards and room doors to work around beyond just the large wall runs in the lounge. looking at about 11 meters of hallway walls excluding door ways and same again of lounge.
#1 | Tradie 1 | No recent reviews | 74 jobs | No longer in contact |
#2 | Tradie 2 |
|
55 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 3 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 | No recent reviews | 53 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 4 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 0 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 39 jobs | No longer in contact |
Partner with Builderscrack
Get work