Published: 24 September 2017
Paint ceilings throughout a priority and maybe walls 3 bedroom hallway kitchen diner lounge but one room was done a while back so not needed small home with good surface finish around windows plus doors we have aluminum ranch sliders etc We need a quote and time frame when to start and how long it will take
#1 | Tradie 1 | No recent reviews | 5 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 2 jobs | No longer in contact |
#4 | Tradie 4 |
|
51 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 17 jobs | No longer in contact |
Partner with Builderscrack
Get work