Published: 11 April 2024
This job requires two separate quotes: 1. Paint the entire exterior top floor (being 2 x 2 bed units) brown cedar and all joinery. (NOT including barge board under gutters, eaves or handrails). 2. Paint the downstairs brick and tile (being 2 x 2 bed units) all wooden door and window joinery. Notes: The flashing above all windows are metal and some have some rust showing in small places, they must be sanded and prepped with metallic rust-proof undercoat before painting in good quality top coat paint. The upstairs 'rear' vertical cedar will need a portable scaffold for access and you can plank off this to the much higher garden.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Eddy and his team were amazing. Eddy started on time and finished ahead of time due to the very good weather we had for a week, he didn't loose any time taking advantage of it. The quality of his workmanship was excellent. He communicated regularly with all four owners which is a feat in itself. He provided invoicing as requested by four owners and again this was an extra burden for him that he didn't complain about. Super happy with the end result. Thank you so much.
Work carried out by the owner/operator
Reviewed on 14-05-2024
Partner with Builderscrack
Get work