Published: 8 November 2023
Interior of house to be fully painted, including walls, framing and doors. 3 bedrooms, kitchen, dining, living, rumpus room, laundry and walk in wardrobe. Ceiling in rumpus room need to painted. Rest of the ceiling in the house is lockwood, no need to paint. Bathroom walls are tiled floor to ceiling, both ceilings will need to be painted. Ceilings will be white, walls and doorframing will be a different colour.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner & subcontractors
Reviewed on 04-12-2023
Partner with Builderscrack
Get work