Published: 9 July 2024
Digging out all soil and concrete to landfill at the back of the section about 9m (width) x 1.5m (depth) x 0.7m (height) volume dirt. Retaining Walls (Below 1.5m)
#1 | Tradie 1 |
|
24 jobs | Quoted |
#2 | Tradie 2 | No recent reviews | 2 jobs | In contact |
#3 | Tradie 3 |
|
77 jobs | No longer in contact |
#4 | Tradie 4 |
|
20 jobs | No longer in contact |
#5 | Tradie 5 |
|
7 jobs | No longer in contact |
#6 | Tradie 6 |
|
7 jobs | No longer in contact |
#7 | Tradie 7 |
|
7 jobs | No longer in contact |
#8 | Tradie 8 |
|
49 jobs | No longer in contact |
Partner with Builderscrack
Get work