Published: 29 April 2020
Hi there, There is an 8 meter section besides the carport with low steepness and easy access that requires a retaining wall. Initial inspections shows that the wall does not need to be higher than 1 meters. As part of this work, there is above ground water conduit (from strip drain) that needs to be relocated as well. Please let me know if you need any more info. Cheers, A
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very clean and professional job with very reasonable price. Totally recommend.
Work carried out by the owner/operator
Reviewed on 18-06-2020
Tradesperson reply
"Thanks Amir..."
Partner with Builderscrack
Get work