Published: 16 October 2017
I would like to fill in a hole of 0.5 metre wide, 0.5 metre deep and 4-5 metres in length with potting mix. Remove some dirt and stones from property from the hole we dug and dispose. Also possibly disposing a small to medium tree that we are planning on removing too.
Workmanship |
4.0
|
Cost |
1.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 14-11-2017
Partner with Builderscrack
Get work