Published: 28 July 2017
Spread topsoil around yard area and level out - approx 10sqm area maybe 5sqm topsoil required. Plus fill in ground above pipe with either topsoil or gap 7 approx 15 m x 200mm height
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Would recommend Martin good comms very prompt helpful and did a great job. Wish I had found him sooner for other jobs!
Work carried out by the owner/operator
Reviewed on 07-08-2017
Tradesperson reply
"Thanks very much A pleasure working for you."
#1 | Tradie 1 | No recent reviews | 17 jobs | Secured job |
#2 | Tradie 2 |
|
68 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 17 jobs | No longer in contact |
#4 | Tradie 4 |
|
162 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work