Published on 16 May 2021
I wanted to enquire about the price to remove the fire box/ steel log burner, hearth, flue, repair to gib ceiling and metal tin roofing with the time frame that it can be arranged please? It's a freestanding masport log burner, single storey house.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ian was very professional. Job was completed the day after Ian assessed it. We are very happy with the workmanship, cleanliness, punctuality and highly recommend Ian. Cost was the same as discussed before doing the job.
Work carried out by the owner/operator
Reviewed on 14 June 2021
Tradesperson reply
"Thanks for the work"
Partner with Builderscrack
Get work