Published: 20 June 2024
To replace the cracked fibre cement boards (?) which run along the bottom of my cladding. They are below the cedar weatherboards and are in contact with the concrete driveway. Total length is just over 11 metres and the boards are approximately 180mm high. Please see photos attached and let me know if any questions. Timing: as soon as possible please.
#1 | Tradie 1 |
|
3 jobs | No longer in contact |
#2 | Tradie 2 |
|
13 jobs | No longer in contact |
#3 | Tradie 3 |
|
52 jobs | No longer in contact |
#4 | Tradie 4 |
|
38 jobs | No longer in contact |
#5 | Tradie 5 |
|
3 jobs | No longer in contact |
#6 | Tradie 6 |
|
0 jobs | No longer in contact |
Partner with Builderscrack
Get work