Published: 8 March 2023
Several small jobs hopefully able to be done in March 2023. Building and setting in place structure for outdoor seed-raising. Replacing under-deck corrugated plastic, keeping under-deck area dry and adding spouting. Altering above-fridge cabinetry to allow for taller fridge (all new models taller than old failing fridge)
#1 | Tradie 1 |
|
38 jobs | No longer in contact |
#2 | Tradie 2 |
|
59 jobs | No longer in contact |
#3 | Tradie 3 |
|
19 jobs | No longer in contact |
#4 | Tradie 4 |
|
29 jobs | No longer in contact |
Partner with Builderscrack
Get work