Published: 11 September 2022
Our bungalow current do not have DMP under the house and would require laying. The total area to be covered is approx 90m2. The house have concrete piles and the space underneath is ample at about 800mm to 1000mm, one corner may be slightly tighter than that. The ground is generally flat, and the space under the floor is generally dry and easy to work with. The shape is basically a regular rectangle with regular pile spacing. The DMP layer should comply to NZBC. There is no tight time frame to be completed, as long as it is agreed.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Easy to work with, and fast communication. From showing interest to get it all done in 10 days. Happy with the result! Cheers guys.
Work carried out by the owner/operator
Reviewed on 26-09-2022
Partner with Builderscrack
Get work