Published: 11 November 2014
We have lots of dirt leftover from excavation work, mostly clay and clay rock (crushed up pretty fine), but there is a little other concrete and brick rubble too. At a guess there is probably about 10 cubic metres Good clean fill to level up your yard if you need it, there will probably be some topsoil at the bottom of the heap as that came out first. Pretty easy digging as it's already been dug up before. Been sitting around a while and weeds are starting to grow, so need it all gone. If you need more cleanfill, we have some concrete fences, paths and walls that need to go to, so you are welcome to that, but might take a little more effort :-) Very easy flat access, most of it you can drive up to with your trailer or truck and load straight on... and we have more out the back of the house, which is still flat access, but you would need to wheelbarrow it or if you have one of those narrow dumpy things, drive back and forth.
Partner with Builderscrack
Get work