Published: 21 February 2022
We have a couple of dents in internal doors, some holes in our bathroom that need plastering/painting, 3 door frames which need repair and/or painting, glass join that needs resealing and cracks in wall that need a touch up. The biggest job is to paint the bathroom. It's 2 x 2m and mostly tiled, so not that big :) I've attached the photos for reference. All are little jobs but together could take a couple of days, it's just touchups and maintenance from regular wear and tear :)
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 03-03-2022
Partner with Builderscrack
Get work