Published: 10 February 2022
Dismantle and remove retail store shelving and store room storage shelves and brackets. Remove some to dump and carry some into a moving van to go to storage. Repair damage to walls after removal and leave a clean surface ready for painting. Timing - from Mid March. Deadline 31 March.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent communication. Very tidy and capable. Rob was adaptable and willing to do what was needed. Would recommend for sure. Quote was clear and fair and about right.
Work carried out by the owner/operator
Reviewed on 01-04-2022
Partner with Builderscrack
Get work