Active job

Water mains pipe burial

Job image
Job image
Job image
Job image
Job image

Job description

General Handyman Tasks
Wellington

Published: 9 June 2020

Plumber has installed new water mains pipe (PVC). I've buried half of it (i.e. from the road to the top of my driveway), I need the other half buried. Total pipe length remaining to be buried: Approx 20m. I will get the plumber to disconnect the water mains at the beginning of the day and reconnect it at the end, so it's important the work is completed in a day (i.e. less than 8 hours). Will need to be done during the week (Mon-Fri). Pipe needs to go down about 20-30cm below the surface. Minor complications: - There is one small tree stump in the path of the pipe (tree has already been felled). The tree stump will need to be removed. - Some of pipe path follows a moderately step gradient up to the house (grass) - On the remaining section of the pipe path, there is concrete below the soil. However, it probably won't be necessary to go any deeper than the conrete. But I want someone who can deal with concrete should the need arise. Will post photos up tomorrow.


Trade professionals

Finding available tradies …

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo