Published: 26 August 2013
My guttering has mostly come off my 2 storey home. The street side and an alcove have been replaced but the other 3 sides plus a small roof projection need replacing. It is likely that the board behind the guttering will need replacing and painting too. Both of the east to west sides are above terrain that slopes away from the road, ie the street front is one storey and graduates to 2 storey. Both sides are 7200mm but one side is interrupted by a chimney. The rear of the house is 2 storey and half is above an alcove the other is 2 storeys clear to the ground. The rear measures 9800 continuous and requires one down-pipe 1 storey high which terminates to an alcove roof. The roof projection is 2400 and requires a down-pipe that terminates into guttering 3000m below. I have a length of guttering 3000mm and a few bits and pieces-see photo.
#1 | Tradie 1 |
|
374 jobs | No longer in contact |
Partner with Builderscrack
Get work