Published: 31 October 2018
I have had a new kitchen fitted which required an extension into another room (bedroom) to accommodate an oven tower. The kitchen fitter did the alteration but not the resultant plastering on both the kitchen/dining area wall and ceiling and the bedroom wall. I have also had a heater removed from the lounge with resultant holes that need fixing.
Partner with Builderscrack
Get work